Depositphotos_3153453_s.jpg

A Typical Turn-key Bioset Solution Model

Our Example Client was considering buying a Solar Dryer for around 4 million dollars. 

* This is an example presenting the concept—not exact figures.
* Model based on 5200 wet tons a year/ 5 years

 

We presented them with a 5 year turn-key solution that included:

  • Capital
  • Design
  • Installation
  • Chemicals
  • Disposal
  • Hauling
  • Marketing
  • Repairs
  • Maintenance (Did not include Labor for operations.)

Total cost: $3,222,400.00

Revenue is also then generated by the City from selling BDS the Bioset material: $10.00 a ton/$52,000 a year.

 


Investment example

 

Operations (Chemicals, Electricity, Hauling, Overhead)

Equipment/Disposal (landsite costs to prepare Class A material)

Total Operations Costs


Material Costs 

Capital Costs (Bioset Equipment)

Total Costs 

1 year

 330,480.00

$62,000.00

 

 

$52,000.00 

$200,00

$644,480.00

5 Year 

$1,652,400.00

$310,000.00

$1,962,400.00

 

$260,000.00

 $1,000,000

$3,222,400.00 


Your Community Can See Similar Results!